top of page
a4-paper-withs-quare-grid-5-milimeters-square-sheet-geometrical-pattern-2M6DK98_edited.jpg

Your IPD portfolio backs up your final report forms and demonstrates both your engineering competence and your communication ability to reviewers. Having a complete, well-structured portfolio ready when you submit your Professional Review application prevents reviewer delays or interview refusal.   

Designed for aspiring Chartered Structural Engineers, this structured 3-page reference guide turns formatting rules and evidence-selection standards into an actionable assembly workflow.   

What’s Inside This Guidance Note:

  • Submission & Route-Specific Rules: Exact requirements for sending your portfolio and separate supporting records (quarterly forms, Progress Summary Records, or signed training records) directly to both reviewers via secure electronic transfer.

  • Strict Formatting Specifications: Clear rules on the single-PDF limit (300 pages maximum), A4 text vs. A3 drawing limits, minimum font sizing (Arial 10 or equivalent), and hyperlinked bookmark navigation.

  • Evidence Selection Matrix ("Prefer vs. Avoid"): Practical guidance on choosing high-value calculation extracts, annotated drawings, and option-appraisal summaries over bulky, repetitive project packages.

  • Worked Portfolio Entry Example: A concrete bridge-assessment example showing how to combine grillage-model outputs, hand checks, annotated drawings, and first-person responsibility statements.

  • Confidentiality & NDA Redaction Guide: What commercial or client details to redact, which technical assumptions and decisions must remain visible, and how to avoid over-redacting.

  • Pre-Issue Checklists & 5-Step Submission Sequence: Verification tables covering Core Objective coverage, ownership, readability, and final quality checks before issuing your PDF.   

Who This Guide Is For:

  • Candidates compiling their IPD portfolio ahead of their Professional Review Interview (PRI) application.

  • Engineers under Individually Managed, Externally Accredited, or Retrospectively Collated routes who need clarity on separate supporting records.

  • Candidates working on confidential or NDA-restricted projects who need to present valid engineering evidence safely.

PRI_03_IPD Portfolio Guidance

£0.00Price

    RCC Column Preliminary Design Explained | Clear & Fast (Ideal for IStructE Aspirants)

    bottom of page